All work

Case Study

OLE SALAJAH OMS

Operations Management System

A custom operations management platform designed to control workshop production, inventory, materials, workforce, job cards, sales and operational reporting.

Client
Ole Salajah
Services
Business Systems, Internal Tools, Cloud & Infrastructure, UI/UX Design
Scope
Production, Inventory, Materials, Workforce, Job Cards, Sales, Reporting

Operations overview

Dashboard

Search jobs, materials, staff…/ Tue, 29 Sep 2026

Open job cards

24+3 today

In production

11across 5 stages

Low-stock items

62 critical

Sales · September

KES 2.48M68% of target

Completed jobs · last 14 days

14D30D90D
16 Sep22 Sep29 Sep

Jobs by stage

Queued5
Cutting3
Fabrication4
Finishing2
Quality check2

Recent job cards

View all
JobDescriptionStageDueStatus
JC-2041Double-leaf steel gateFabrication02 OctOn track
JC-2040Water tank stand, 5,000 LFinishing30 SepDue soon
JC-2039Security grilles × 8Cutting06 OctOn track
JC-2037Steel staircase, 14 stepsQuality check29 SepReview

Stock alerts

6
  • Mild steel sheet 2 mm4 / 10
  • Primer, grey 20 L2 / 6
  • Square tube 40×4012 / 20
  • Welding rods 3.2 mm3 / 5

01 · Overview

About the project.

OLE SALAJAH OMS is the system the workshop runs on. Every job is opened as a job card, moved through its production stages, supplied with materials from inventory and assigned to the people doing the work. Sales and reports come from the same records, so management sees what is really happening on the floor.

02 · The challenge

The problem to solve.

A workshop runs on moving parts: materials arriving and being consumed, jobs moving through production stages, people assigned across shifts, and sales that depend on all of it.

When that information lives in separate notebooks, spreadsheets and conversations, nobody has a reliable picture of what is happening on the floor, what things really cost, or what needs attention next.

03 · The approach

How we engineered it.

01

Workflow first

Mapped how work actually moves through the workshop, from order to finished job, before designing a single screen.

02

One source of truth

Modelled production, stock, people and sales in one database so every module reads from the same records.

03

Built for the floor

Designed fast, focused screens for supervisors and staff, not only for managers at a desk.

04

Traceable by design

Linked materials and labour to job cards so cost and progress can be traced back to their source.

04 · The system

What we built.

The parts of the system and what each one does.

01

Dashboard

A live overview of open jobs, production progress, stock alerts and sales.

Operations overview

Dashboard

Search jobs, materials, staff…/ Tue, 29 Sep 2026

Open job cards

24+3 today

In production

11across 5 stages

Low-stock items

62 critical

Sales · September

KES 2.48M68% of target

Completed jobs · last 14 days

14D30D90D
16 Sep22 Sep29 Sep

Jobs by stage

Queued5
Cutting3
Fabrication4
Finishing2
Quality check2

Recent job cards

View all
JobDescriptionStageDueStatus
JC-2041Double-leaf steel gateFabrication02 OctOn track
JC-2040Water tank stand, 5,000 LFinishing30 SepDue soon
JC-2039Security grilles × 8Cutting06 OctOn track
JC-2037Steel staircase, 14 stepsQuality check29 SepReview

Stock alerts

6
  • Mild steel sheet 2 mm4 / 10
  • Primer, grey 20 L2 / 6
  • Square tube 40×4012 / 20
  • Welding rods 3.2 mm3 / 5
02

Inventory

Materials, stock levels, reorder points and movements in and out of the store.

Materials & stock

Inventory

Search jobs, materials, staff…/ Tue, 29 Sep 2026

Stock items

1869 categories

Stock value

KES 1.92Mat cost

Below reorder

62 critical

Movements today

2314 out · 9 in
AllSteelConsumablesPaint & finishesHardware FilterReceive stock
CodeMaterialCategoryOn handReorder atUnit costStatus
MS-0102Mild steel sheet 2 mmSteel 4 sheet 106,850 Reorder
ST-0440Square tube 40×40×1.5Steel 12 length 201,420 Low
ST-0525Rectangular tube 50×25Steel 38 length 201,380 In stock
FB-0030Flat bar 30×5Steel 64 length 25690 In stock
AN-0404Angle line 40×40×4Steel 27 length 151,150 In stock
CN-0132Welding rods 3.2 mmConsumables 3 pkt 52,300 Low
CN-0215Cutting disc 115 mmConsumables 46 pc 20140 In stock
PT-0020Primer, grey 20 LPaint & finishes 2 tin 68,900 Reorder
HW-0310Heavy-duty hingesHardware 58 pair 24480 In stock
03

Production

Every job tracked through its production stages, from queue to quality check.

Job flow by stage

Production

Search jobs, materials, staff…/ Tue, 29 Sep 2026
All jobs · 16Due this week · 7Overdue · 1 SupervisorNew job card

Queued2

JC-2044

Shop front roller shutter

PO Due 09 Oct

JC-2043

Carport frame, 2 bays

DM Due 12 Oct

Cutting2

JC-2039

Security grilles × 8

JKSK Due 06 Oct

JC-2042

Balcony railing, 12 m

PO Due 08 Oct

Fabrication2

JC-2041

Double-leaf steel gate

JKAW Due 02 Oct

JC-2038

Truck body brackets

SK Due 03 Oct

Finishing1

JC-2040

Water tank stand, 5,000 L

MN Due 30 Sep

Quality check1

JC-2037

Steel staircase, 14 steps

LA Due 29 Sep
04

Workforce

Staff, roles, attendance and who is assigned to which job.

Staff, shifts & assignments

Workforce

Search jobs, materials, staff…/ Tue, 29 Sep 2026

Staff

184 roles

On shift now

142 on overtime

On leave

1returns 02 Oct

Hours this week

612of 720 planned

Team

Manage staff
NameRoleTodayAssigned toWeek hrs
JKJ. KamauSenior welder On shiftJC-204142
AWA. WanjiruFabricator On shiftJC-204140
SKS. KipropWelder On shiftJC-203844
POP. OtienoCutter On shiftJC-203938
MNM. NjeriPainter On shiftJC-204036
LAL. AchiengQC inspector On shiftJC-203740
DMD. MutuaFabricator On leave—16

Today's shifts

07:00 – 18:00
J. Kamau
A. Wanjiru
S. Kiprop
P. Otieno
M. Njeri
L. Achieng
07:0012:3018:00
05

Job Cards

The full record of a job: customer, specification, materials, labour and status.

Job Cards / JC-2041

Job Card JC-2041

Search jobs, materials, staff…/ Tue, 29 Sep 2026

Double-leaf steel gate In production

Created 24 Sep 2026 · Supervisor J. Kamau · Priority normal

PrintMove to Finishing
Customer
Walk-in customer
Order date
24 Sep 2026
Due date
02 Oct 2026
Specification
3.6 m × 2.1 m, 40×40 frame, 2 mm sheet infill, grey primer + black gloss

Materials issued

Issue material
MaterialQtyUnit costTotal
Square tube 40×40×1.59 lengths1,42012,780
Mild steel sheet 2 mm3 sheets6,85020,550
Heavy-duty hinges3 pairs4801,440
Welding rods 3.2 mm1 pkt2,3002,300

Progress

60%
  1. Order received 24 Sep
  2. Cutting 26 Sep
  3. Fabrication in progress
  4. Finishing
  5. Quality check
  6. Delivered

Job costing

Materials
37,070
Labour · 22 h
9,900
Overheads
3,500
Cost to date
KES 50,470
Quoted price
KES 78,000
06

Reports

Sales, production and material consumption reports, ready to export.

Operational reporting

Reports

Search jobs, materials, staff…/ Tue, 29 Sep 2026
Apr – Sep 2026This monthCustom range ExcelExport PDF

Sales vs production cost · KES M

SalesCost
AprMayJunJulAugSep

Material consumption

Sep
Steel64%
Paint & finishes15%
Consumables12%
Hardware9%

Scheduled reports

New report
ReportFrequencyLast generatedRecipients
Daily production summaryDaily · 07:0029 Sep 07:00Management
Stock movement reportWeekly · Mon28 Sep 07:00Stores, Management
Job costing reportMonthly01 Sep 07:00Management
Workforce hoursWeekly · Fri25 Sep 18:00HR

Interfaces shown with sample data.

05 · Architecture

A system, not a website.

Role-based access for each type of user, one shared database, and reporting built on the same records the business uses every day.

06 · What it enables

The result.

  • Production, inventory, workforce and sales in one system
  • Materials and labour traceable to each job card
  • Stock alerts before materials run out
  • Operational reports without manual compilation

Need a system like this?

Tell us how your operation works today, and what you need it to do.

Start a Project
Chat with us